UTNI makes environment for nature & human
> PROJECT EXPERIENCES
>
Date |
Customer |
Project / Item |
2009.09 |
Doosan Heavy Industries&Construction |
30kW MCFC Instrument Interface(Signal Interface) |
2009.09 |
Doosan Heavy Industries&Construction |
IMCS Control Cabinet (Supply of Cabinet) |
2009.09 |
Doosan Heavy Industries&Construction |
High Temperature Flange Heater for Dummy Stack Supply & Installation of Heater |
2009.08 |
KEPCO |
KEPCO 125KW MCFC Power Plant System Electric Panel, PLC Panel & Control System etc(GE, Rockwell) |
2009.07 |
SK ENERGY[ULSAN] |
SK Energy Ulsan Complex Marine Terminal VOC Removal System(PLC System etc |
2009.05 |
Doosan Heavy Industries&Construction |
300kW MCFC System Interface Purchase(Signal Interface, Air Piping Hook-Up) |
2009.04 |
Doosan Heavy Industries&Construction |
Fuel Cell Seperator Combine Device(Control System) |
2009.03 |
Lidong Chemical(China) |
Kero Tank Low Pressure On/Off Control Valve Supply Low Pressure On/Off Butterfly Valve |
2009.02 |
SK ENERGY[ULSAN] |
SK Energy Ulsan Complex Marine Terminal VOC Removal System Continuous Emission Measuring System |
2008.10 |
LIDONG CHEMICAL(China) |
Lidong Chemical Marine Terminal VOC Removal System (4th) MCC, PLC Panel & Control System (Rockwell) |